do not change any architecture materials or structure add medium density climbing vines only on the existing vertical cable lines cover every cable from ground to roofline including those above the brick volume vines must be straight continuous and follow each cable precisely from bottom to top do not place any vines on the glass brick frames or any surfaces other than the cables