change the roof surface with new standing seam sheet metal roof remove all the wooden sticks from the garden to the terrace remove the steel frame between the lower door and the lower right window increase the height of the central door maintaining the position of the upper side of the old door replacing the old wood frames of the lower door and windows with new timber frames maintaining position thikness and dimensions double the number of the wooden beams under the roof remove the green cloth under the window replace the wooden boards placed on the ground in the right lower quadrant of the image with a low old stone wall