expand second floor to the left remove handrail match charcoal metal panel on the exterior of expansion match roofline of the existing on expansion and do not extend past back wall run metal panel horizontally to match existing leave stucco band beneath metal panel add 2 evenly spaced punched windows without munition to the expansion leave large existing window in place