do not alter any architecture proportions structure cables plants tables chairs materials or the background building only fix the two issues described below 1 fix the left window frame on the far left remove the incorrect horizontal window mullion inside the glass the window must be one continuous vertical pane keep the vertical mullion exactly where it is ensure the glass sits cleanly inside the concrete opening with no clipping no other window or concrete structure should change 2 fix the vine height at the top of the cables the vines must grow only on the vertical steel cables but should reach all the way up to the underside of the top pitched beam remove any gaps between the top of each vine and the beam do not add vines onto the beam itself maintain natural variation in the vines but keep them strictly cable bound do not modify anything else in the scene only the window mullion and the vine height