task redesign the provided floor plan into a functional dental clinic use the uploaded drawing as a fixed architectural shell and reference general rules mandatory use the input plan as a strict base do not change exterior perimeter facade geometry curved walls structural load bearing walls modify only internal partitions preserve approximate room proportions where possible output must match the same monochrome architectural drafting style black white consistent line weights hatched structural walls technical drawing conventions similar furniture graphic style exterior openings strict curved facade left side there are 3 windows the middle window must become the only main entrance door the existing entrance must be converted into a window long straight facade bottom right there are 2 windows these must serve the main treatment room do not add new openings remove openings move any windows the building must have only one entrance total functional zoning strict layout 1 reception administration entry zone use the entire circular room functions reception desk waiting area this is the only entrance zone 2 main treatment room primary space must be located exactly in the marked rectangular zone from the reference size requirement minimum 21 m target 21 28 m must occupy the full facade with the two windows be positioned along this daylight wall layout 2 dental units proper working clearance around chairs 3 support rooms strict order location place all support rooms only along the opposite wall upper side of plan order from right to left mandatory toilet staff room sterilization room compressor technical room do not change this sequence do not distribute these rooms elsewhere corridor circulation create a single linear corridor between treatment room window side support rooms opposite wall this corridor is the main circulation spine access rules reception connects into corridor treatment room accessed from corridor each support room has its own door from corridor additional requirement provide direct or very close adjacency between treatment room sterilization room spatial organization must follow this logic curved front zone reception only entrance middle band corridor window facade treatment room opposite wall linear row of support rooms this must be a clear linear layout not central or scattered strict prohibitions arshin must not change outer perimeter move structural walls add additional entrances place support rooms near treatment room windows rearrange support room order scatter rooms across the plan reinterpret zoning creatively planning priorities efficient dental workflow clear patient vs staff circulation maximum natural light in treatment room logical sterilization proximity realistic corridor width 1 4 1 6 m compact functional support rooms clean and professional clinical layout output requirement produce a complete floor plan drawing monochrome technical style with walls doors windows furniture readable room layout consistent with original graphic language important follow the provided annotated scheme exactly this is not a conceptual redesign it is a controlled internal re planning within a fixed shell